Créer un compte

Vous avez oublié votre mot de passe!

ZIM A 2000

  • ZIM A2000 machine can make concrete pipe, square culvert and other concrete materials between 800mm-2000mm diameter and 2000mm-3500mm lenght.
  • In this machines mortar stocking and filling operations are done by mortar conveyor band with bunker.
  • Materials which produced in this machine are transferred to drying area via crane.
  • Our machine is making production on steel pallets. Produced material is carried to drying area with outer mould. After discharging the ready material to drying area, outer mold is movingto main machine for new production.
  • Our Machine is working with hydraulic press and vibration systems.
  • Vibration system of the machine is special design of ZIM Engineers.
  • Vibration system which have oil cooling system and special oil unit. 
  • Special designed strong chassi of the machine enables long live producing without errors. Vibration table is made on high precision CNC machines.
Concrete Pipe Dimensions Ø800mm - Ø2000mm / 1500mmx1500mm
Concrete Pipe Length 2m / 2,5m / 3,5m
Vibrator Type Special Type with grease
Total Electric Power 55 kW
Hydraulic Cooling System Cooling With Air
Command System Manual - Electrcal
Material Dimensions  Material Height  Pcs / Day (8hour) 
Ø800mm 2000mm 50 Pcs
Ø1000mm 2000mm 45 Pcs
Ø1200mm 2000mm 40 Pcs
Ø1400mm 2000mm 35 Pcs
Ø1600mm 2000mm 30 Pcs
Ø1800mm 2000mm 25 Pcs
Ø2000mm 2000mm 20 Pcs
1500x1500mm 2000mm 20 Pcs
1000x1000mm 2000mm 30 Pcs
Motrar Filling Conveyor With Bunker
Motrar Filling Conveyor With Bunker
Production Pallet
Production Pallet
Fiber Heading
Fiber Heading
Twisting Cylinder for Steel Reinforcement
Twisting Cylinder for Steel Reinforcement
Portal Crane
Portal Crane
Testing Press
Testing Press
ZIM A 2000 BETON BORU ÜRETİM MAKİNASI
ZIM A 2000 BETON BORU ÜRETİM MAKİNASI
BETON BORU ÜRETİM TESİSİ
BETON BORU ÜRETİM TESİSİ
BETON BORU ÜRETİM MAKİNASI
BETON BORU ÜRETİM MAKİNASI
TOP

ZIM A 2000